IdeaTek has announced 138 miles of fibre-to-the-home construction to serve 119 locations in Osage and Lyon counties, Kansas. If you were ordering the drop cables for that project, which lengths would you ask suppliers to quote?

Dividing 138 by 119 gives 1.16 project miles per planned location. The announcement gives the construction mileage and intended coverage. To price pre-terminated drops, a supplier needs the route from each terminal to each property and the number of cables to order in each length. IdeaTek's 19 November announcement

A request for quotation (RFQ) can start with the same information the installer will use on site. For a block of flats, that means a surveyed route through the building. At a remote OLT site, it means a port map. For a dense rack, it means showing how a technician can reach a port when the panel is full.

How much drop cable should you order for scattered rural homes?

Start with the address list. Group properties around candidate terminal locations, then measure the route from each terminal to each property. Mark which addresses will be connected first. That gives you the lengths and quantities for the first order.

Corning's 2008 model of a new 400-home development compared 4-, 8- and 12-port terminals. Using fewer, larger terminals reduced the number of terminals and handholes in that model and could increase drop lengths. A newer U.S. survey from the Fiber Broadband Association and Cartesian found that median reported drop costs moved modestly with length and were higher underground than aerial. For drops under 100 ft, the medians were $556 underground and $338 aerial. For drops over 500 ft, they were $675 and $400 respectively. Compare the layouts using each drop's routed length and installation method, then price any extra distribution cable, terminal and civil work separately. Corning greenfield model, "Terminal Port Count" · 2025 FBA/Cartesian cost study, Figure 2.15, published January 2026

Terminal sizes to quote. Corning's model used 4-, 8- and 12-port terminals. For your layout, state the required number of subscriber outputs at each site, any spare capacity and the mating interface. Glory pole-mounted terminal selection guide

A worked example: eight addresses on one road

Two aligned layouts of the same eight rural addresses. One 8-port terminal is at 600 m. Two 4-port terminals at 325 m and 925 m shorten the drops but extend the shared distribution route.

Figure 1. Both layouts serve the same eight addresses. Solid lines show shared distribution cable and dashed lines show individual drops. Glory editorial example.

All terminals sit on the east edge, so four drops cross the road in either layout. For this example, add the distance along the road to the address setback, then add 30 m of total end reserve and round up to the next 100 m for ordering. The sketch counts crossings separately. On a real survey, measure the full path through each crossing.

Address Position (m) Side Setback (m) 8-port: route / order (m) 4+4 ports: route / order (m)
A1 100 E 40 540 / 600 265 / 300
A2 250 W 60 410 / 500 135 / 200
A3 400 E 30 230 / 300 105 / 200
A4 550 W 80 130 / 200 305 / 400
A5 700 E 50 150 / 200 275 / 400
A6 850 W 40 290 / 400 115 / 200
A7 1,000 E 70 470 / 500 145 / 200
A8 1,150 W 30 580 / 700 255 / 300

The two layouts then compare like this:

Measure One 8-port terminal Two 4-port terminals
Terminal locations 1 (at 600 m) 2 (at 325 m and 925 m)
Shared distribution route to the last terminal 600 m 925 m
Longest drop route 580 m 305 m
Total drop route 2,800 m 1,600 m
Road crossings 4 4
Order lines by length 6 (200, 300, 400, 500, 600, 700 m) 3 (200, 300, 400 m)
Total drop length ordered 3,400 m 2,200 m
First phase (A2, A3, A6): terminals needed 1 2
First phase: drop length ordered 1,200 m 600 m

The two 4-port terminals need 325 m more shared distribution cable and a second terminal in phase one. The single 8-port terminal needs six order lengths and 1,200 m more drop cable overall. The table compares cable quantities. To compare installed costs, get prices for the extra terminal and shared route work, and price the aerial or underground drops by address.

Attach to the RFQ: the Address and Terminal Allocation Table

One row per address, with these columns:

Address ID Serving terminal and port Route length (m) End reserve (m) Order length (m) Phase (first or later)
A2 325 m terminal, port 2 135 30 200 First

Group the rows by serving terminal and order length so every supplier prices the same quantities. Add the drop connector, polish and installation method where these differ. Glory can start from a route sketch, a partial GIS export or a subscriber table. Glory FTTH ODN solution

Glory GL-MST02-04 outdoor fibre terminal shown with cable stubs and connectors

GL-MST02-04 4-port multiport service terminal

Consider this outdoor terminal for one four-address group where the mating interfaces and fibre map fit the design.

Quote each terminal with the required stub length, mating parts and fibre-to-port map.

View the 4-port terminal

Which fibre route has the building owner approved?

A surveyor finds a clear route from the street into the basement and a locked riser door. The contractor can measure and price the entry run, then carry the riser as a provisional item until the owner confirms access and approves the route upstairs.

On 19 November the UK government published its response to the consultation on broadband in leasehold flats. It estimated that about 1.13 million flats in England and Wales lacked access to a gigabit-capable connection in May 2026. The proposed process under the Commonhold and Leasehold Reform Bill would allow eligible long leaseholders to request deployment and receive an evidenced response on technical feasibility. Detailed surveys and access agreements come later. UK government consultation response

Openreach's process shows where the contractor gets the route. After the relevant permission and wayleave paperwork, Openreach surveys the building and asks the owner to approve the proposed route. The common-area build follows that drawing. Resident visits can be scheduled separately for work inside individual flats. Give suppliers separate lines for these two scopes so they can state which route lengths are fixed and which await access. Openreach wayleave guidance

A worked example: a six-storey block

Six-storey block with four flats per floor. The drawing shows the approved route from the street chamber to the riser base, the riser awaiting access, partly surveyed corridors and separate runs inside flats.

Figure 2. Six floors, 24 flats and one distribution box per floor. Colours and line styles mark the survey status of each segment. Glory editorial example.

Segment Length Status How to quote it
Street chamber to building entry point 22 m Measured, route approved Fixed quantity
Entry point to riser base 14 m Measured, route approved Fixed quantity
Riser base to floor 6 18 m From drawings, shaft access not yet confirmed Provisional allowance, re-measure
Floor box to flat door, 24 runs 5–16 m each Measured on floors 1 and 6 only Provisional for the other floors
Flat door to rosette, 24 flats Not measured Set at each resident's installation visit Separate line, excluded from common-area price
Closed front cover of the Glory GL-2-B wall fibre rosette

GL-2-B indoor fibre rosette

Use at the flat's indoor drop termination. The wall box provides up to two fibre positions with SC or FC simplex adapter options.

State the cable entry, mounting position, adapter type and polish, and loaded port count.

View the indoor rosette

Attach to the RFQ: the Segment Survey Drawing

Mark each segment's measured or provisional length and the owner's approval status. Add photos and usable dimensions at every box position. Suppliers can then list floor boxes, wall boxes and indoor cable by segment and show which quantities are allowances. Glory FTTP installation acceptance checklist

Where do the fibres terminate at a remote OLT site?

On 18 November, Harmonic announced that German operator TeleData was expanding XGS-PON using Pier optical line terminal (OLT) shelves in remote hubs. For the team pricing one of those sites, the first drawing to request is the patching plan. It should show where the uplink lands and where each PON connection leaves the rack for the distribution network. Harmonic's TeleData announcement

A service-group count alone leaves room for different quotes. Harmonic's Pier datasheet describes dual-density optics that can serve two groups from one physical port. Ask for the interface map for the modules actually selected, with the adapter, patch cord and outgoing fibre identified for each optical path. Harmonic Pier datasheet, hosted by Normann Engineering

Attach to the RFQ: the Port and Fibre Map

Generic remote hub showing the upstream device and uplink on the OLT's left and, on its PON side, a patch cord, ODF position, outgoing fibre and splitter.

Figure 3. Remote OLT handoffs to document. The operator's port map defines the modules and physical interfaces. Glory editorial example.

Give each mapped optical path its own row. For a port serving multiple groups, use the module's interface map to fill in the actual paths.

OLT port Module / service groups Faceplate connector Patch cord ODF position Outgoing cable and fibre Status
Shelf 1, PON 1 XGS-PON, 1 group [from vendor port map] [type, length] [tray, position] [cable ID, fibre no.] Live in this phase
Shelf 1, PON 2 Dual-density, group A [from vendor port map] [per map] [per map] [per map] Installed, not yet in use
Shelf 1, PON 2 Dual-density, group B [from vendor port map] [per map] [per map] [per map] Installed, not yet in use
Shelf 1, PON 3 Module not yet selected [to be confirmed] [to be confirmed] [reserved position] [reserved fibre] Reserved space only

Glory editorial template. Fill the bracketed fields from the operator's documents and count shared hardware once.

Use the status column to distinguish equipment that needs pricing now from positions reserved for expansion. Include spare adapters that the supplier is to install in this phase. Mark empty positions for future use as reserved.

Ask the supplier to list the ODF configuration, splice capacity, adapter types and counts, and each patch cord's length and connectors at both ends. If this is an upgrade over an existing optical distribution network, include the approved coexistence and optical-loss requirements. Glory ODN deployment guide

Glory GL-ODF rack-mount distribution frame with front cover open and splice and adapter modules visible

GL-ODF 19-inch optical distribution frame

Consider this rack-mount frame where the remote hub needs a defined location for fibre splicing and patching.

Send the rack space, splice count and adapter schedule from the port and fibre map.

View the GL-ODF frame

Can a technician reach the middle MPO port?

A fully patched panel passes the access check if a technician can read the label on a middle port, disconnect its jumper and inspect the end face without disturbing adjacent connections. Test with the cassettes, jumpers and probe you intend to use. If the panel has a sliding tray, extend and close it while checking for tension on neighbouring cords.

State the count in MPO adapter positions, terminated fibres or usable links as appropriate. STL's SC26 listing gives one example, a 64/72-port 1U MPO architecture whose counting unit the buyer should confirm. For the sample record, specify the loaded configuration, probe and tip, photos and agreed optical pass limits. IEC treats end-face inspection and optical measurements as separate checks. STL SC26 listing · IEC end-face inspection · Glory connector cleaning guide

Glory 2U LGX MPO patch panel with its front LC duplex adapter rows visible

2U LGX MPO sliding patch panel

This sliding chassis accepts modular cassettes. The pictured configuration shows LC duplex adapters at the front.

Specify the loaded cassette mix, rear MPO interfaces and cords for the full-panel access test.

View the 2U MPO panel

What to attach to a fibre cabling RFQ

The Fiber Optic Association recommends starting the documentation during design and carrying it through quotation, installation and testing. Use the rows that match your scope to show each supplier what to price and what evidence to provide. FOA project documentation guidance

Work package Buyer attaches Supplier fills in
Rural FTTH Address and Terminal Allocation Table, phased connection plan, measured or estimated routes Terminal specification and quantity, order lengths and counts, reserve assumptions
Existing flats Entry point and riser drawing, segment lengths, usable box dimensions, route approval status Floor box and wall box configuration, indoor cable by segment, re-measure items and pricing assumptions
Remote OLT site Port and Fibre Map, available rack space, scope of this phase ODF configuration, installed adapter count, splice capacity, patch cord list with both ends defined
High-density rack Fully loaded panel drawing, unit definition, maintenance actions, agreed inspection and optical tests Installed configuration, sample test records, optical test reports available and conditions

Pick one real route drawing or one port table from your project. Mark the drawing revision, the quantity for this phase and the items still waiting for confirmation, and send it with the RFQ. Ask every supplier to list materials and pricing assumptions against the same drawing. When two quotes arrive at different prices, you can then see whether the gap comes from an extra terminal, a longer cable or an added test. You can send your drawing or table to Glory through the request-a-quote page.