Oct 20, 2026
FTTR: When Point-to-Point Fiber (G.p2pf) Makes Sense
Point-to-point FTTR (G.p2pf) connects selected rooms to the residential gateway through dedicated optical Ethernet links. This article compares G.p2pf with G.fi
-
Oct 20, 2026FTTR: When Point-to-Point Fiber (G.p2pf) Makes SensePoint-to-point FTTR (G.p2pf) connects selected rooms to the residential gateway through dedicated optical Ethernet links. This article compares G.p2pfview more -
Nov 23, 2026What Network Numbers Leave Out of a Fibre Cabling RFQ?IdeaTek has announced 138 miles of fibre-to-the-home construction to serve 119 locations in Osage and Lyon counties, Kansas. If you were ordering theview more -
Nov 20, 2026Pre-Terminated vs Field-Terminated Fiber CablingPre-terminated systems often reduce on-site termination labor and compress installation schedules. Field termination can be less expensive when cableview more -
Nov 19, 2026Data Center Fiber Handoff From Carrier Entrance to Tenant RackPut the physical handoff where both parties can identify, access and test the same port. For many colocation routes, that means a managed carrier termview more -
Nov 19, 2026Fiber Cabling for Edge AI in Telecom Central OfficesThis article covers the passive fiber layer only. The question is a practical one: if the central office is still carrying live services, how do you cview more -
Nov 18, 2026What U.S. Fiber Mergers Mean for Data Center Networks and Fiber-to-the-Home D...Zayo completed its purchase of Crown Castle's fiber solutions business on May 1, 2026, taking on about 90,000 route miles of metro-dense fiber. AT&T'sview more -
Nov 18, 2026How Long Does Fiber Optic Cable Last? When to Reuse, Repair, or Replace ItPicture two sites about to receive upgraded equipment. The cable between them has carried traffic for nearly 30 years, and one splice closure on the rview more -
Nov 17, 2026GIA Article 11: A Buyer's Guide to Shared Building Fiber AccessA building can have fiber on every floor and still be awkward for a second operator to serve. The distribution cabinet may be full, the riser route maview more -
Nov 16, 2026Tight Buffered vs Loose Tube Fiber CableA 12-fiber link can be short, easy to access and still spend part of its life in a wet duct. A much larger cable can remain inside a building from endview more -
Nov 16, 2026Fiber Cable Types in TelecomFor an ISP planner, contractor or procurement team, the useful question is which complete cable design suits the route and the work that follows. Thisview more -
Nov 10, 2026OM4 or OS2 for 60–70 m Leaf-Spine Links? A 100G-to-800G Decision GuideYou are building a new leaf-spine data center. Rows hold about 40 cabinets, the longest leaf-to-spine link is 60–70 m, and you still have 100G SR4 modview more -
Nov 09, 2026Where to Test MPO Fiber Links in Data Centers: MPO Ports, LC Cassettes, or Br...A factory-tested MPO trunk arrives on site with a passing report. After installation, an LC cassette sits at each end of the trunk, and a reviewer hasview more