GIA Article 11: A Buyer's Guide to Shared Building Fiber Access

Nov 17, 2026

Leave a message

Glory Optical Engineering Team
Glory Optical Engineering Team
The Glory Optical Engineering Team​ is an elite group of senior telecommunications experts, structural engineers, and network architects. Serving as the core technical engine behind Glory Optical Communication.

Quick answer. Article 11 of the Gigabit Infrastructure Act (GIA) gives providers of public electronic communications networks a right to request access to existing in-building physical infrastructure on fair, reasonable and nondiscriminatory terms. For a buyer, the practical first step is to walk one additional operator connection through the building drawing: the route, the handoff, the dwelling termination and the records that change. This guide provides a drawing review, five ODF checks, a 24-dwelling capacity example and RFQ wording. Cables, including dark fiber, fall outside the GIA's definition of physical infrastructure, so reuse of installed fiber is a separate question from Article 11. Last updated: November 17, 2026.

A building can have fiber on every floor and still be awkward for a second operator to serve. The distribution cabinet may be full, the riser route may be undocumented, or a technician may need to move working patch cords to reach an unused adapter. These are details a buyer can investigate before ordering the next enclosure.

GIA Article 11 gives this procurement question a regulatory context. For an ISP, building owner or FTTH contractor, the useful starting point is the next connection: show how another authorized operator would reach the building distribution, identify the intended dwelling and complete the agreed work.

This guide turns that question into a drawing review, a capacity example and suggested RFQ wording.

Understand the Access Rules Before Selecting Hardware

Article 11(2) addresses access to existing in-building physical infrastructure where duplication is technically impossible or economically inefficient. Article 11(3) requires reasonable written requests to be met on fair, reasonable and nondiscriminatory terms, with pricing where appropriate. Property rights remain protected. The GIA separately defines fiber wiring and excludes cables, including dark fiber, from physical infrastructure. Source: Regulation (EU) 2024/1309, Articles 2 and 11.

BEREC's final guidance, BoR (25) 142, applies from November 12, 2025. It recommends considering suitable access to existing fiber first, without making that outcome universal. It also favors an access point that multiple operators can readily reach. Footnote 8 gives infrastructure examples including the access-point room, ODF and connecting mini-ducts; its reference to the final drop segment must be read alongside the cable exclusion. Source: BEREC guidance, paragraphs 18–25, 28 and 51–52.

For the building-equipping obligations, use Glory's separate GIA Article 10 buyer checklist. Here, start with the installed distribution and the work another provider needs to perform.

Separate the assets on the drawing

Give the room, cabinet, pathways, installed cables and service equipment separate entries in the asset schedule. A single label such as "building fiber system" leaves too much uncertainty when ownership, maintenance and expansion are discussed.

Drawing item Record before requesting a quotation Why the buyer needs it
Access location Room or outdoor position, approach route and working area Establishes where the technician and equipment can fit
Distribution hardware Enclosure, ODF, mounting arrangement and entry positions Defines the supplied assembly and its installation footprint
Pathways Riser and floor routes, entry sizes and surveyed occupancy Shows where a proposed additional cable could run
Installed wiring Cable identity, fiber allocation, endpoints and current use Supports an assessment of reuse or additional wiring
Operator equipment Handoff position, splitter location and responsibility Establishes the boundary between building distribution and each provider

Mark which items are common and which are operator-dedicated, and record who approves changes to each. The supplier can then quote against a defined arrangement.

Conceptual building fiber path from entry through ODF or termination box and riser to the subscriber outlet.

Figure 1. Building-connection review based on Glory's FTTH ODN solution. The project drawing determines operator boundaries, splitter placement and floor-node locations.

Compare the Connection Arrangements Before Counting Ports

An RFQ that starts with "two operators, 48 ports" has already assumed an architecture. Compare the connection arrangements before any port count is fixed. Two operators serving the same building do not automatically require two complete sets of dwelling fibers.

Compare three connection arrangements: a common set of dwelling fibers with an agreed patching interface for changing the serving provider; separate operator cables through available pathways; or a shared distribution location with dedicated sections of wiring.

Each arrangement needs its own drawing, operating agreement and optical design. Where a dwelling fiber is patched between providers, record the selected connection state and switching procedure. Do not assume that connecting two operators to the same fiber simultaneously will work; any such design requires a specifically engineered and authorized optical arrangement.

Compare the proposals using the same work scenario. Select one dwelling, identify its current provider, and trace the proposed connection to the alternative provider. Count the components the technician would touch and identify any interruption to the selected subscriber. Then check whether neighboring services are exposed during that work.

For a GPON or XGS-PON proposal, include the PLC splitter location and intended optical path on the operator drawing. Glory's FTTH ODN solution identifies PON type, optical class, split ratio and connector interface as inputs to the passive configuration. Check the selected splitter's specified loss against the operator's optical budget, then confirm its mounting and fiber routing inside the enclosure. The quotation should identify the included splitter, adapters, pigtails and patch cords.

Check Five Details in a Shared ODF Proposal

Use these five checks to compare a fiber optic termination box or fiber optic patch panel against the building drawing.

1. Working space with the assembly loaded

Ask for the internal arrangement at the initial load and the proposed expansion load. Include adapters, splice trays, cable entries and stored slack. A photograph of an empty enclosure cannot show whether the technician can reach the last adapter after the cables are installed.

Mark the door swing, tray movement and tool access. If a tray must move, show where its fibers travel during that movement. Ask the supplier to identify the cable and cord bend limits used in preparing the layout, then check those limits against the proposed routing.

2. Entry space for the next cable

Count occupied entries separately from usable future entries. Show the route from each future entry to its proposed termination area. An unused knockout may still be difficult to use if its internal route is blocked by installed equipment.

For an existing building, compare the enclosure entries with the surveyed approach route. A generous cabinet does not solve a congested penetration or an inaccessible riser. That is a route problem rather than a cabinet problem: have it surveyed and closed with the designer or contractor before the enclosure order goes in.

3. A clear division of operating responsibility

Mark common distribution and operator-specific areas. If the proposed operating model needs separate access permissions, compare a common cabinet, partitioned cabinet and separate adjacent enclosures. Assess the space and maintenance consequences of each option.

Independent locks can be useful in some arrangements. Specify them only after deciding who needs to reach which components and how authorized access will be managed. A lock schedule supports the agreed maintenance process, including emergency access and replacement keys.

4. Labels that survive provider changes

Assign a stable identifier to each dwelling connection. Maintain the serving operator as a separate field in the port schedule. This lets the building record remain understandable when a resident changes provider.

Ask for a sample label sheet and matching port map with the quotation. Check that a technician can read the labels with patch cords fitted and distinguish a dwelling port from an operator handoff. Specify how the map will be updated after an authorized change.

5. Capacity described by function

Request separate counts for installed dwelling terminations, operator handoff terminations, splice positions and available expansion positions. Identify whether each future position is fitted, partially equipped or only reserved mounting space.

"48-port enclosure" is insufficient if one group serves dwellings and another serves operator handoffs. A product example makes the distinction clearer: Glory's GL-ODB-16S termination enclosure lists 24-fiber capacity, up to 16 SC adapter positions and space for one optional 1×16 PLC splitter. These are different limits. List dwelling terminations, operator handoffs and splice positions separately, then check the fully assembled configuration against the connection drawing.

GL-ODB-16S product example separating 24-fiber management, up to 16 SC adapter positions and one optional 1x16 PLC splitter.

Figure 2. Capacity labels from the GL-ODB-16S product page. This example explains the difference between functions; the 24-dwelling design requires its own termination and handoff schedule.

A 24-Dwelling Example: Reuse and Dedicated Wiring

Consider a building with 24 dwellings. Assume its existing distribution has one terminated fiber to each dwelling, and the project is assessing how to accommodate a second operator. These quantities are not a prescribed fiber count.

Under a reuse arrangement, retain the 24 dwelling terminations and design the provider handoff separately. Determine that handoff capacity from the selected network architecture. Record how a dwelling is assigned to a provider, who performs a change and how its connection record is updated.

Note the legal boundary before choosing reuse. The GIA excludes cables, including dark fiber, from "physical infrastructure", so using fiber that is already installed is a separate question from Article 11. Access to in-building fiber wiring is governed by the European Electronic Communications Code and national law, and BEREC notes that such access will not always suit the operator asking for it. Source: BEREC guidance, paragraphs 26 and 51–52. Confirm which regime applies to the project before the connection arrangement is fixed.

Under a dedicated-wiring arrangement, assume the second operator requires one additional terminated fiber to every dwelling. That arrangement adds 24 dwelling-side terminations, plus its separately designed handoff and any required splicing. It also needs a surveyed cable route and a workable installation method.

Capacity item Reuse arrangement Additional dedicated wiring
Existing dwelling terminations 24 retained 24 retained
Additional dwelling terminations None in this example 24 under the stated assumption
Operator handoff capacity Set by the splitter hierarchy and the OLT ports each operator brings; sized on its own, not proportionally with dwelling positions Depends on where the second operator splits: with home-run fibers from its own OLT ports, a handoff sized for all 24 dwelling fibers plus the associated splice positions; with splitters in the building, sized from the splitter hierarchy as in the reuse column
New riser cable Assess whether needed Included in this arrangement
Work to change a serving provider Define the authorized patching or connection process Define the dwelling connection and switching process

Now add a working allowance for eight future dwelling termination positions. In the reuse arrangement, this produces 32 planned dwelling positions: 24 installed and eight future. Handoff ports, splitter outputs and duct routes are calculated separately from dwelling positions.

Read the two columns as a decision rule. Carried through the same eight future dwellings, reuse gives 32 planned dwelling positions. Dedicated wiring gives 64 if each future dwelling also receives one fiber per operator (48 terminated today plus 16 future), or 56 if future dwellings are served by one operator only; state which assumption applies to the project. Either way, dedicated wiring to every dwelling can push the enclosure up a size class, so check the planned count against the standard port sizes of the proposed assembly, and it adds riser cable, splicing and installation work. That is why it holds up mainly where the second operator carries the riser cost or where the two networks have to be operated and maintained independently. Where neither condition applies, compare reuse against the additional cabinet and riser work, after checking existing capacity and the applicable access arrangement.

State what the eight future positions contain. They might be fitted adapters and assigned splice positions, or reserved panel space requiring a later module. Price both options explicitly if the buying team wants to compare deferred expenditure with an equipped assembly.

Finally, check the arrangement with the future components fitted. A capacity allowance is useful only when its cables, terminations and maintenance movements can be accommodated. Record any additional hardware or construction needed to activate it.

Match the passive assembly to your building drawing

Compare the rack assembly, a floor or zone enclosure, and the splitter package against the same connection drawing. These Glory products cover different parts of that selection.

Glory Optical Distribution Frame product photograph from its official product page

Optical Distribution Frame

Rack-mounted splice and patch distribution.

Review capacity and installed tray loading.

Glory GL-ODB-16S Enclosure product photograph from its official product page

GL-ODB-16S Enclosure

16 SC positions with separate fiber management.

For a smaller floor or zone node; size by node demand.

Glory 1×8 LGX PLC Cassette product photograph from its official product page

1×8 LGX PLC Cassette

One input and eight outputs in an LGX cassette.

Confirm cassette fit and the required split plan.

For configuration and quotation, send the connection drawing, dwelling count, handoff plan, connector type and initial/future loading to Glory.

Discuss the building distribution configuration

Keep Access Pricing Separate From the Hardware Quotation

BEREC generally recommends free use of building-owner-owned infrastructure. For operator-owned infrastructure, it recognizes investment considerations and evidence-based pricing. These are guidance positions, subject to the applicable national framework and circumstances. Source: BEREC guidance, paragraphs 42–49.

For bid comparison, use separate schedules for purchased components, installation work and ongoing services. Keep any proposed infrastructure-access charge separate as well. A cabinet unit price and a recurring access fee answer different commercial questions.

If a proposal combines them, ask the bidder to identify the assets and work covered by each line. Record who owns newly installed components and who maintains them. This makes it possible to compare an initial installation package with a proposal that includes later connection visits or ongoing maintenance.

Give the commercial team the same drawing revision used for the technical quotation. Otherwise, two parties may negotiate a price while assuming different cabinet space, pathway use or connection boundaries.

GIA Article 11 Access Requests Need a Clear Record

Article 13(1)(d) allows referral to the national dispute settlement body when agreement has not been reached within one month after receipt of the formal access request. Article 13(2)(b) sets a further one-month decision deadline, extendable in duly justified exceptional circumstances. This is not a guaranteed two-month installation schedule. Source: Regulation (EU) 2024/1309, Article 13.

For project administration, keep a dated record of the request, its recipient and the arrangement proposed. Attach the specific drawing revision and identify the unresolved issue. "No space" should lead the project team to establish which entry, route or termination area is in question.

Maintain a short decision log as the technical proposal changes. Record whether a revised route, another enclosure position or a different connection arrangement addresses the problem. Separate survey findings from assumptions that still need inspection.

Before using a dispute procedure, confirm its submission requirements with the competent national body. Preserve the correspondence and evidence already collected rather than reconstructing the file after negotiations stall. BEREC flags incomplete submissions as a possible cause of timing complications. Source: BEREC guidance, paragraph 82.

Suggested RFQ Wording for the Passive Assembly

Adapt this wording to the approved design, applicable national specifications and agreed responsibilities:

Supply the building distribution assembly against the referenced connection drawing and capacity schedule. Identify the dwelling terminations, operator handoff positions, splice positions, cable entries and expansion provisions separately. Provide an internal arrangement drawing for the initial and planned expanded configurations, including slack storage and maintenance access. State the supplied interfaces and components, the routing limits used, and any items required later to activate reserved capacity. Identify every deviation from the requested arrangement in the quotation.

Pair that wording with a defined document list. Request the assembly drawing, component schedule, port map, installation instructions and proposed acceptance method. Where a requirement concerns the building route or access agreement, assign it to the responsible project party instead of leaving it inside the supplier's general scope.

For an acceptance demonstration, select a representative dwelling connection and rehearse the agreed work on a suitable sample or controlled installation. Confirm that the technician can identify the connection, reach the intended termination and route the cord without disturbing unrelated fibers. Record any intended interruption to the selected line.

Use the project's approved optical acceptance plan for measurements. Identify the test endpoints, reference method, required results and record format before testing. Compare results with the specified components and network design; avoid adding an unexplained universal loss limit to the enclosure RFQ.

Questions Buyers Ask About Shared Building Fiber Access

Does accommodating two operators require two full-size cabinets?

Compare a common assembly, a partitioned assembly and separate enclosures against the connection drawing. The choice depends on operating permissions, internal working space, cable routes and expansion requirements. Price the complete configurations so their capacities can be compared fairly.

What should a supplier mean by spare capacity?

The quotation should identify exactly what is available: fitted termination positions, assigned splice space, unused entries, a future module position or another defined provision. Glory's Optical Distribution Frame page lists several rack-mounted capacity options and an integrated splice-and-distribution design. Request the actual adapter and tray loading for the selected configuration, along with any parts needed to activate reserved positions.

Can an existing termination box remain in use?

Start with a survey of its loaded condition. Check the proposed work against entry positions, internal routing, tray access and the port map. Keep it in the proposal only where the design and operating arrangement can accommodate the required connections.

Where should a PLC splitter sit in the assembly?

Show its intended position on the operator's network drawing, then confirm the mounting space, cable routing and interfaces in the enclosure drawing. Include the actual splitter configuration in the optical design and component quotation.

Which document should accompany a request for quotation?

A connection drawing with an itemized capacity schedule gives the supplier a useful starting point. Add photographs and route-survey information for an existing building, plus the required interfaces, installation environment and scope boundaries.

Prepare the Drawing for the Next Connection

Before approving the enclosure order, walk through one additional operator connection on the drawing. Identify the route, handoff, dwelling termination, access permissions and records that change. Resolve the points where the technician would encounter an undefined interface or an inaccessible component.

For a Glory quotation, bring that drawing and capacity schedule to the technical sales team. Request the termination-box or ODF arrangement, included components, expansion options and stated deviations against your project requirements. The broader FTTH ODN solution provides a starting point for defining the passive package.

Ready to specify the passive assembly?

Send the drawing and capacity schedule. Define the rack or box, interfaces, splitter loading and growth provisions for your project.

Request a configured assembly quotation

Prepared for Glory Optical Communication. Product references: the FTTH ODN solution and the linked product pages. The drawing checks and RFQ wording are buyer guidance developed for this article. Applicable national rules and the project agreement determine access arrangements. Sources reviewed on November 17, 2026.