Glory 12 LC Duplex DIN Rail Fiber Termination Box
The Glory 12 LC Duplex DIN Rail Fiber Termination Box brings a fiber cable into a cabinet and presents LC connections on a dedicated front panel. The painted aluminum housing holds a 12-fiber splice module, while the front panel accommodates 12 LC duplex adapters. A rear rail clip provides the mounting interface. Two cable openings let the installer choose the cable approach that suits the cabinet layout.
LC Duplex Panel and Internal Splice Storage12 LC duplex adapter positions 12-fiber splice module · Aluminum housing |
Panel Capacity and Fiber Routing
Count front connections and splices separately
Each LC duplex adapter has two LC positions. With all 12 adapter positions populated, the front panel can present 24 individual connector positions. The internal splice module is specified for 12 fibers. Map the fibers to be spliced to their assigned connector positions before ordering. Projects that need a splice for every front connector position should specify the required internal capacity when requesting a configuration.
Plan the route between the glands and the panel
The two cable openings sit toward the rear of the housing. Within the box, the incoming cable meets the fiber routing area and the splice module. Start with the direction of cable entry, then show where spliced pigtails turn toward the adapters. Reserve room for the cable bend and enough internal slack to service the splice area. Where two cables enter the same cabinet, note which opening is reserved for each cable and match the glands to the cable jacket dimensions before assembly begins.
Assign the LC polish and fiber type on the schedule
Specify the LC connector polish and fiber type for the adapters, pigtails and patch cords that will be used together. List those details alongside the panel quantity. If duplex links are grouped in pairs, identify each pair in the schedule. Keep unused adapter positions capped during cabinet work and record the spare positions separately from the fibers already terminated.
Allow clearance beyond the enclosure outline
The dimensional reference for this front panel shows a chassis approximately 130 mm wide, 130 mm deep and 45.3 mm high. Allow additional clearance for projecting cable glands, LC connectors and the rail clip. Check the cable path with the cabinet door closed and keep the cover fasteners accessible when accessories are installed above or beside the box.
Technical Specifications
| Parameter | Specification |
|---|---|
| Brand | Glory |
| Product line | Fiber Box / Fiber Optic Termination Box |
| Front panel | 12 LC duplex adapter positions |
| Connector positions | Up to 24 individual LC positions with a fully populated front panel |
| Internal splice module | 12 fibers |
| Cable openings | 2 entry or exit openings |
| Enclosure | Aluminum with electrostatic paint finish |
| Chassis reference dimensions | Approximately 130 × 130 × 45.3 mm, excluding projecting hardware |
| Mounting | Rear DIN rail clip |
Plan the Cabinet Layout
Rail Clip and Cable Entry AreaRear view showing the rail clip, the cable gland area and the screw-fastened cover. |
Place a fiber handoff next to the cabinet equipment
In a telecom or industrial network cabinet, position the box so the front adapters can be reached without moving nearby devices. Route patch cords toward the cable manager before they turn toward active equipment. Show this path on the cabinet drawing along with the incoming cable path, so the two routes can be reviewed together.
Organize small distribution points by fiber assignment
For an FTTH distribution cabinet or other small network termination point, label the cable identifier at entry and number the active front positions. Identify the splice and pigtail associated with each active position on the same worksheet. A technician can then trace a link from its patch cord to the incoming fiber during commissioning or service.
Check service access on the selected rail
The rear clip is the reference for placing the enclosure on the rail. Use the cabinet layout and an assembly drawing to review the mating rail profile and the space needed to engage the clip. Leave room to remove the cover and handle the cable entry fittings with adjacent equipment in position. Mark the rail clip location on the cabinet drawing. Check that the rail itself remains accessible once the wiring ducts, mounting brackets and labels are in place.
Define the supply scope before the cabinet build
List the enclosure, front adapters, pigtails and splice protection parts separately on the order. This makes it clear which items are to be supplied with the box and which are part of the installation kit. For a populated assembly, include the port map and the number of fibers the installer will splice inside.
Ordering Details
| Check | Details to provide |
|---|---|
| Front connections | LC polish, fiber type and required adapter population |
| Internal termination | Fiber count, splice plan and pigtail requirements |
| Cable entry | Cable outside diameter, gland requirement and entry direction |
| Mounting and supply | Rail profile, cabinet clearance, accessories and order quantity |
Glory Fiber Optic Termination Boxes
About Glory Optical
|
Glory Optical facility, Ningbo |
Glory OpticalFounded in 2008 · Ningbo, China · OEM/ODM support Based in Ningbo since 2008, Glory Optical supplies passive fiber network components, including terminal boxes, splice closures, adapters, cable assemblies and optical splitters. Manufacturing & OEM/ODM SupportOur capabilities include mold development, enclosure molding and component and cable assembly. For project supply, we review the enclosure drawing, connection layout and packing requirements with the buyer. |
Testing Capabilities
The videos show examples of Glory Optical's enclosure testing.
Water Spray Testing |
Sealing Performance Testing |
Water Resistance Testing |
Project Supply & OEM Support
Share the cabinet layout and the required front connections when requesting a termination box. We can review the panel configuration, internal splice requirements and accessories for the order.
Discuss Your Product or Project Requirement
Include the rail details and unit quantity with your quotation request.
Email: sales@gloryoptic.com
Hot Tags: 12 lc duplex din rail fiber termination box, China 12 lc duplex din rail fiber termination box manufacturers, suppliers, factory, 24 Port Fiber Termination Box, fiber distribution box, fiber to the box, fiber wall box, outdoor fiber junction box, Outdoor Fiber Optic Junction Box